14 - 17 May 2024
For Exhibitors

Production data - Machine set-up

If you will be bringing large machines or equipment with a weight over 2,000 kilos to your stand you must fill in the machine form.

To ensure the fair is safe and that move-in and move-out will function, we must receive your completed form by 10 March at the latest.

Liquids are disposed on Saturday 18 May

Thank you, your form has been submitted.

Company facts

Company facts

Contact person

Contact person

Stand facts

Stand facts

Water supply and sewage disposal

Water supply and sewage disposal

Compressed air

Compressed air

Flammable and Explosive goods

SFS 1988:868 §11

Flammable and Explosive goods

SFS 1988:868 §11

PRODUCT A

PRODUCT A

PRODUCT B

PRODUCT B

PRODUCT C

PRODUCT C

Residual waste

(What residual products need to be handled during your demo operation)

Chemicals / Metals / Plastics / Flammable / Other

Residual waste

(What residual products need to be handled during your demo operation)

Chemicals / Metals / Plastics / Flammable / Other

LIQUIDS ARE DISPOSED ON MONDAY, MAY 16TH

Tag machines to be emptied, and remove any lids of containers to be emptied.

LIQUIDS ARE DISPOSED ON MONDAY, MAY 16TH

Tag machines to be emptied, and remove any lids of containers to be emptied.

Will you be needing emptying?

PRODUCT A

PRODUCT A

PRODUCT B

PRODUCT B

PRODUCT C

PRODUCT C

PRODUCT D

PRODUCT D

PRODUCT E

PRODUCT E

Machine set-up

Transport (Unloading and loading: specify max. dim. and max. weight, and specify per package)

Direct phone to the transport department: (+46) 076-548 61 93

NOTE: Mobile cranes cannot be used in Hall C

Machine set-up

Transport (Unloading and loading: specify max. dim. and max. weight, and specify per package)

Direct phone to the transport department: (+46) 076-548 61 93

NOTE: Mobile cranes cannot be used in Hall C

TRANSPORT A

TRANSPORT A

Lift

PRODUCT B

PRODUCT B

Lift

PRODUCT C

PRODUCT C

Lift

PRODUCT D

PRODUCT D

Lift

PRODUCT E

PRODUCT E

Lift

PRODUCT F

PRODUCT F

Lift

Request for assembly

Request for assembly

Installation:

Installation:

Dismantling:

Dismantling:

Electrical

Electrical

Disconnection of ground fault switches

Ground fault switches are standard. Ordering disconnection on site will be charged separately.

Ground fault switches are standard. Ordering disconnection on site will be charged separately.

24-hour operation

The power is disconnected 1h after the exhibition closes.

The power is disconnected 1h after the exhibition closes.

NOTE, in order to complete the form, attach drawing of electricity supply location in stand.

NOTE, in order to complete the form, attach drawing of electricity supply location in stand.

A confirmation of your entered information will be sent to the submitted email address.

A confirmation of your entered information will be sent to the submitted email address.