If you will be bringing large machines or equipment with a weight over 2,000 kilos to your stand you must fill in the machine form.

To ensure the fair is safe and that move-in and move-out will function, we must receive your completed form by 19 March 2026 at the latest.

Liquids are disposed on Saturday 23 May

Company facts

Company facts

Machine set-up - Transport

Transport (Unloading and loading: specify max. dim. and max. weight, and specify per package)

Phone number to transport department: +46 36 15 22 85

ATTENTION! Lifting with a mobile crane is not possible in Hall C.

 


Machine set-up - Transport

Transport (Unloading and loading: specify max. dim. and max. weight, and specify per package)

Phone number to transport department: +46 36 15 22 85

ATTENTION! Lifting with a mobile crane is not possible in Hall C.

 


Request for set-up time

Request for set-up time

Unloading:

Unloading:

Loading:

Loading:

Number of machines
Number of machines

Machine 1

Machine 1

Lift with mobile crane or forklift?


Electricity


Electricity
Disconnecting the earth fault circuit breaker

Earth fault circuit breaker is standard. Ordering disconnection on site will be charged separately.

Earth fault circuit breaker is standard. Ordering disconnection on site will be charged separately.

Connection to machine: Supplied with connection cable.

 



Compressed air

We only supply connections of the cejn type.

 



Compressed air

We only supply connections of the cejn type.

 



Water supply and sewage disposal

 



Water supply and sewage disposal

 



Residual waste


(What residual products need to be handled during your demo operation)
Emptying is carried out daily.

Chemicals / Metals / Plastics / Flammable / Other

 



Residual waste


(What residual products need to be handled during your demo operation)
Emptying is carried out daily.

Chemicals / Metals / Plastics / Flammable / Other

Will you be needing emptying?

 



Emptying of liquids

Emptying is carried out daily.
Mark which machine is to be emptied and remove the lid from the container to be emptied.

 



Emptying of liquids

Emptying is carried out daily.
Mark which machine is to be emptied and remove the lid from the container to be emptied.

Will you be needing emptying?


Machine 2



Machine 2

Lift with mobile crane or forklift?


Electricity


Electricity
Disconnecting the earth fault circuit breaker

Earth fault circuit breaker is standard. Ordering disconnection on site will be charged separately.

Earth fault circuit breaker is standard. Ordering disconnection on site will be charged separately.

Connection to machine: Supplied with connection cable.

 



Compressed air

We only supply connections of the cejn type.

 



Compressed air

We only supply connections of the cejn type.

 



Water supply and sewage disposal

 



Water supply and sewage disposal

 



Residual waste


(What residual products need to be handled during your demo operation)
Emptying is carried out daily.

Chemicals / Metals / Plastics / Flammable / Other

 



Residual waste


(What residual products need to be handled during your demo operation)
Emptying is carried out daily.

Chemicals / Metals / Plastics / Flammable / Other

Will you be needing emptying?

 



Emptying of liquids

Emptying is carried out daily.
Mark which machine is to be emptied and remove the lid from the container to be emptied.

 



Emptying of liquids

Emptying is carried out daily.
Mark which machine is to be emptied and remove the lid from the container to be emptied.

Will you be needing emptying?

Machine 3

Machine 3

Lift with mobile crane or forklift?


Electricity
 


Electricity
 
Disconnecting the earth fault circuit breaker

Earth fault circuit breaker is standard. Ordering disconnection on site will be charged separately.

Earth fault circuit breaker is standard. Ordering disconnection on site will be charged separately.

Connection to machine: Supplied with connection cable.

 



Compressed air

We only supply connections of the cejn type.

 



Compressed air

We only supply connections of the cejn type.

 



Water supply and sewage disposal

 



Water supply and sewage disposal

 



Residual waste


(What residual products need to be handled during your demo operation)
Emptying is carried out daily.

Chemicals / Metals / Plastics / Flammable / Other

 



Residual waste


(What residual products need to be handled during your demo operation)
Emptying is carried out daily.

Chemicals / Metals / Plastics / Flammable / Other

Will you be needing emptying?

 



Emptying of liquids

Emptying is carried out daily.
Mark which machine is to be emptied and remove the lid from the container to be emptied.

 



Emptying of liquids

Emptying is carried out daily.
Mark which machine is to be emptied and remove the lid from the container to be emptied.

Will you be needing emptying?

Machine 4

Machine 4

Lift with mobile crane or forklift?


Electricity


Electricity
Disconnecting the earth fault circuit breaker

Earth fault circuit breaker is standard. Ordering disconnection on site will be charged separately.

Earth fault circuit breaker is standard. Ordering disconnection on site will be charged separately.

Connection to machine: Supplied with connection cable.

 



Compressed air

We only supply connections of the cejn type.

 



Compressed air

We only supply connections of the cejn type.

 



Water supply and sewage disposal

 



Water supply and sewage disposal

 



Residual waste


(What residual products need to be handled during your demo operation)
Emptying is carried out daily.

Chemicals / Metals / Plastics / Flammable / Other

 



Residual waste


(What residual products need to be handled during your demo operation)
Emptying is carried out daily.

Chemicals / Metals / Plastics / Flammable / Other

Will you be needing emptying?

 



Emptying of liquids

Emptying is carried out daily.
Mark which machine is to be emptied and remove the lid from the container to be emptied.

 



Emptying of liquids

Emptying is carried out daily.
Mark which machine is to be emptied and remove the lid from the container to be emptied.

Will you be needing emptying?

Machine 5

Machine 5

Lift with mobile crane or forklift?


Electricity


Electricity
Disconnecting the earth fault circuit breaker

Earth fault circuit breaker is standard. Ordering disconnection on site will be charged separately.

Earth fault circuit breaker is standard. Ordering disconnection on site will be charged separately.

Connection to machine: Supplied with connection cable.

 



Compressed air

We only supply connections of the cejn type.

 



Compressed air

We only supply connections of the cejn type.

 



Water supply and sewage disposal

 



Water supply and sewage disposal

 



Residual waste


(What residual products need to be handled during your demo operation)
Emptying is carried out daily.

Chemicals / Metals / Plastics / Flammable / Other

 



Residual waste


(What residual products need to be handled during your demo operation)
Emptying is carried out daily.

Chemicals / Metals / Plastics / Flammable / Other

Will you be needing emptying?

 



Emptying of liquids

Emptying is carried out daily.
Mark which machine is to be emptied and remove the lid from the container to be emptied.

 



Emptying of liquids

Emptying is carried out daily.
Mark which machine is to be emptied and remove the lid from the container to be emptied.

Will you be needing emptying?

Machine 6

Machine 6

Lift with mobile crane or forklift?


Electricity


Electricity
Disconnecting the earth fault circuit breaker

Earth fault circuit breaker is standard. Ordering disconnection on site will be charged separately.

Earth fault circuit breaker is standard. Ordering disconnection on site will be charged separately.

Connection to machine: Supplied with connection cable.

 



Compressed air

We only supply connections of the cejn type.

 



Compressed air

We only supply connections of the cejn type.

 



Water supply and sewage disposal

 



Water supply and sewage disposal

 



Residual waste


(What residual products need to be handled during your demo operation)
Emptying is carried out daily.

Chemicals / Metals / Plastics / Flammable / Other

 



Residual waste


(What residual products need to be handled during your demo operation)
Emptying is carried out daily.

Chemicals / Metals / Plastics / Flammable / Other

Will you be needing emptying?

 



Emptying of liquids

Emptying is carried out daily.
Mark which machine is to be emptied and remove the lid from the container to be emptied.

 



Emptying of liquids

Emptying is carried out daily.
Mark which machine is to be emptied and remove the lid from the container to be emptied.

Will you be needing emptying?
NOTE, in order to complete the form, attach a sketch of the location of the power supply.
NOTE, in order to complete the form, attach a sketch of the location of the power supply.

Once you have submitted your information, you will receive a confirmation here and it will also be sent to your e-mail address.

Once you have submitted your information, you will receive a confirmation here and it will also be sent to your e-mail address.